
| Preface 1 Main Results of Sediment Research for the TGP 1.1 Runoff and Sediment Load Inflows 1.2 Reservoir Operation Scheme for Long-term Functioning 1.3 Siltation in Navigation Channels and P0rts in Fluctuating Backwater Zone 1.4 Ri se of Flood Stage in Chongqing Reach due to Reservoir Sedimentation 1.5 Sediment Deposition in Dam Area 1.6 Down stream Channel Degradation and Its Impact on Flood Control and Navigation 2 Reservoir Impoundment and Field Observations 2.1 Reservoir Impoundment 2.2 Field Observations 3 Summary of Observed Streamflow and Sediment Data 3.1 Variations in Upstream Runoffs and Sediment Load 3.2 Reservoir Sedimentation 3.3 Variation in Runoffs and Sediment Loads and Channel Degradation below the TGP Dam 4 Impact of Sediment Problems and Countermeasures 4.1 Impact of Sediment Deposition and Scour on Navigation 4.2 Impact of Channel Degradation on Flood Control 4.3 Impact of Deposition in Front of Dam on Power Generation 5 PreIiminary Examination of Previous Research Results 5.1 Incoming Conditions of Water Flow and Sediment Load 5.2 Computation for Reservoir Sedimentation 5.3 Degradation Downstream from the Dam 5.4 Comparison between Field Data and Results of Physical Models in Dam Area 6 Conclusions 6.1 Principal Results of Field Observation in Recent Years and Preliminary Analysis 6.2 Prospect |
商品评论(0条)