网上购物 货比三家
您现在的位置:快乐比价网 > 图书 > 经济管理 > 理财 > 商品详情

Performance-based Earned Value绩效导向型项目价值

分享到:
Performance-based Earned Value绩效导向型项目价值

最 低 价:¥462.40

定 价:¥578.00

作 者:PaulSolomon,RalphYoung 著

出 版 社:吉林长白山

出版时间:2006-12-1

I S B N:9780471721888

商品详情

编辑推荐

内容简介

Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical,schedule,and cost objectives by improving earned value management (EVM) practices。Providing innovative guidelines,methods,examples,and templates consistent with capability models and standards,this book approaches EVM from a practical level with understandable techniques that are applicable to the management of any project。
  Clear and unambiguous instructions explain how to incorporate EVM with key systems engineering,software engineering,and project management processes such as establishing the technical or quality baseline,requirements management,using product metrics,and meeting success criteria for technical reviews。Detailed information is included on linking product requirements,project work products,the project plan,and the Performance Measurement Baseline (PMB),as well as correlating technical performance measures (TPM) with EVM。With straightforward instructions on how to use EVM on a simple project,such as building a house,and on complex projects,such as high-risk IT and engineering development projects,it is the only book that includes excerpts from the PMI’s Project Management Body of Knowledge (PMBOK),CMMI,the EVM System standard,systems engineering standards,federal acquisition regulations,and Department of Defense guides。

作者简介

目录

Acknowledgments xix
Chapter Topic
1 0verview of PBEV
IntroductiOn
What iS PBEV?
PBEV Characteristics
Reputation of Earned Value Management
Lessons Learned
 Inadequate Early Warning
  Poor Implementation of EVMS
  ReIiable.Valid Information
  Product Requirements and Quality
 Processes
  Measures
Snapshot of EVM
EVMS History and Limitations
 EVMS History
  EVMS Limitations
Customer Expectations for Performance—Based
 Management Systems
 U.S.Federal POIicv
 U.S.Department of Defense Policies
  Integrating Systems Engineering with Earned
 Value Management
National Defense lndustriaI Association
Standards and Capability Models
Customer Demand for ExcelIent Processes
CMMI as a Framework for Process
lmprovement
Customer Needs for Reduced Cycle Time and
Evolutionary Acquisition
Increasing UtiIization Of EVM
PBEV and Agile Methods
Enterprise Demand for Cost。E仟ective
Processes
Evolution of PBEV
Comparison of PBEV with EVMS
PBEV Process Flow
About this Book
Summary
References
2 Principles and Guidelines of PBEV
Introduction
EVMS Guidelines
PBEV Principles and GUidelines
PBEV Principles
PBEV Guidelines
First Principle
Product Scope
Product Requirements
Development of Product Requirements
Guideline 1.1
Guideline 1.2
Guideline 1.3
Second Principle
Performance
Base Measure
Guideline 2.1
Guideline 2.2
Guideline 2.3
Guideline 2.4
Guideline 2.5
Guideline 2.6
  ……
3. Product Requirements Baseline
4. Maintain Bidirectional Traceability
5. Progress Toward Meeting Product Requirements
6. Establish Planned Values and Allocate Budget
7. Variance Analysis
8. Level of Effort
9. Integrate Risk Management with EVM
10. Changes to the Performance Measurement Baseline
11. Agile Methods
12. Requirements and Earned Value
13. Using PBEV to Manage Software-Intensive Development
14. Supplier Acquisition Management
15. Moving Forward
Appendix A. Fundamentals of Earned Value Management
Appendix B.Detailed Planning Guidance
Appendix C. American National Standards Institute
Appendix C-1. Experts from NDIA PMSC ANSI/EIA 748-A,Standard for Earned Value Management Systems Intent Guide
Appendix D. Federal Acquisition Regulations (FAR) Rule On EVMS.
Appendix E. Enabling Work Products
Appendix F. Trade Studies
Appendix G. Allocated Requirements
Appendix H. Technical Performance Measures
Appendix I.Success Criteria
Glossary
About the Authors
Index

商品评论(0条)

暂无评论!

您的浏览历史

loading 内容加载中,请稍后...